Brickwork and concrete are two fundamental components of building construction. Brick masonry is commonly used for walls, partitions, enclosures and other masonry applications, while concrete is used extensively in foundations, slabs, beams, columns, walls, pavements and other structural or non-structural works.
However, a construction drawing alone does not completely describe how a material should be procured, tested, mixed, placed, finished and protected. This is where a construction specification becomes important.
A good specification converts design intent into clear requirements for materials, workmanship, execution, testing, inspection and measurement.
For architecture students, understanding specifications is important because architectural drawings are closely connected with material selection, construction detailing, estimation and site execution. For practicing architects, specifications provide a structured way to communicate requirements to contractors and coordinate architectural, structural and service-related work.
This article explains the principles of preparing specifications for brickwork and concrete, with particular attention to material quality, workmanship, testing, quality control and coordination with drawings.
Important: The exact specification for a project must be based on the approved drawings, structural design, project specifications, contract documents, applicable codes and local authority requirements. The information below is educational guidance and should not replace project-specific engineering or contractual requirements.
Quick Answer: What Is a Specification for Brickwork and Concrete?
A specification for brickwork and concrete is a written description of the required materials, quality, proportions or mix requirements, workmanship, construction procedures, testing, inspection, curing, finishing, protection and measurement for a particular item of building work.
A professional specification should answer five basic questions:
- What material is required?
- What quality or standard must it satisfy?
- How should the work be executed?
- How will the completed work be inspected or tested?
- How will the work be measured and paid for?
1. What Is a Construction Specification?
A construction specification is a written document that supplements drawings and describes requirements that cannot be communicated adequately through drawings alone.
For example, a drawing may indicate a masonry wall thickness and location. The specification can additionally define:
- Type of masonry unit
- Applicable material standard
- Mortar requirements
- Bonding arrangement
- Workmanship
- Joint treatment
- Tolerances
- Curing
- Testing
- Protection
- Measurement
Your existing article on specifications in architectural work explains the distinction between brief and detailed specifications and emphasizes materials, workmanship, dimensions, methods and measurement. The present article extends that concept specifically into brickwork and concrete execution.
Specification and drawing should work together
A specification should never contradict the drawings.
For example:
Drawing:
230 mm masonry wall.
Specification:
Defines the masonry unit, mortar, bond, workmanship, joint treatment, curing and applicable standards.
Together, the drawing and specification communicate both where the work occurs and how the work is to be constructed.
2. Types of Construction Specifications
2.1 Brief Specification
A brief specification provides a concise description of the principal materials and construction requirements.
Example:
Brick masonry in cement mortar of specified proportion using approved burnt clay bricks, constructed to the required thickness, line, level and plumb.
It is useful for preliminary estimates and simplified descriptions.
2.2 Detailed Specification
A detailed specification describes the work much more completely.
It may include:
- Scope
- Materials
- Standards
- Material testing
- Storage
- Preparation
- Mixing
- Execution
- Workmanship
- Inspection
- Testing
- Curing
- Finishing
- Protection
- Measurement
- Acceptance criteria
Detailed specifications are particularly important in tender and contract documentation.
2.3 Standard Specification
A standard specification refers to established requirements issued by organizations or standards bodies.
For Indian projects, relevant BIS standards may be incorporated into project specifications where applicable.
2.4 Special Specification
A special specification is prepared where a project has requirements that are not adequately covered by standard specifications.
Examples include:
- Heritage masonry
- Architectural exposed brickwork
- High-performance concrete
- Special concrete finishes
- Marine or aggressive environments
- Special waterproof concrete
- Large-volume concrete pours
3. Important Principles of Specification Writing
A good specification should be:
Clear
Requirements should be understandable to the contractor, consultant and site team.
Specific
Avoid vague statements such as “good quality material.”
Instead, identify the required standard, grade, class, performance or approval requirement.
Coordinated
The specification should agree with:
- Architectural drawings
- Structural drawings
- MEP drawings
- BOQ
- Schedules
- Material submittals
- Contract conditions
Measurable
Where relevant, the specification should establish how completed work will be measured.
Verifiable
Requirements should be capable of being inspected, tested or documented.
Project-specific
Do not blindly copy an old specification from another project.
A specification suitable for a low-rise residential building may not be suitable for a high-rise building, industrial facility, hospital or infrastructure project.
4. Specifications for Brickwork
4.1 Scope of Brickwork Specification
A brickwork specification should normally address:
- Brick type
- Applicable standard
- Classification or performance requirements
- Mortar
- Water
- Bond
- Wall thickness
- Surface and joint treatment
- Openings and junctions
- Workmanship
- Curing
- Scaffolding and access
- Inspection
- Measurement
- Protection
For clay brick masonry, IS 2212:1991 is listed by BIS as the code of practice for brickwork. BIS also lists IS 2250:1981 for preparation and use of masonry mortars.
4.2 Brick Material Requirements
The specification should identify the type of brick required and the applicable product standard.
For common burnt clay building bricks, BIS currently lists IS 1077:2025, which addresses classification, general quality, dimensions and physical requirements.
This is particularly important because older construction notes frequently refer to previous editions of the standard.
A project specification should therefore identify the applicable current edition or contractually adopted edition, rather than copying an old reference without verification.
Brick inspection should consider
- Uniformity
- Shape
- Dimensions
- Surface condition
- Cracks and defects
- Warpage
- Efflorescence
- Water absorption
- Compressive strength
- Batch consistency
The exact acceptance requirements should be taken from the applicable product standard and project documents.
5. Mortar Specification for Brickwork
Mortar connects masonry units and transfers stresses between them.
A mortar specification should identify:
- Binder
- Fine aggregate
- Water
- Mortar type
- Mix or performance requirements
- Mixing procedure
- Workability
- Application
- Joint thickness where specified
- Protection
- Curing
IS 2250:1981 is listed by BIS as the code of practice for preparation and use of masonry mortars.
Important principle
A mortar ratio should not be treated as a universal specification for every building.
The appropriate mortar depends on:
- Type of masonry
- Structural requirement
- Exposure
- Brick characteristics
- Wall function
- Compatibility
- Project design
- Applicable standard
Therefore, statements such as “all brickwork must use 1:5 mortar” should not be presented as a universal rule.
6. Brickwork Workmanship
Good brickwork depends not only on the quality of bricks but also on workmanship.
The specification should address:
Setting out
Wall locations should correspond to approved architectural drawings and grid dimensions.
Line and level
Courses should be maintained in proper alignment and level.
Plumb
Walls should remain vertical within the project tolerances.
Bonding
The specified bond should be followed consistently.
Mortar joints
Joints should be completely filled and executed to the specified profile and thickness.
Junctions
Particular attention is required where masonry meets:
- RCC columns
- Beams
- Slabs
- Door frames
- Window frames
- Other walls
- Service shafts
Openings
Door and window openings should be checked against the architectural drawings before and during construction.
Services
Electrical conduits, plumbing lines and other services should be coordinated before walls are completed.
This is particularly important because uncontrolled chasing can weaken masonry and create unnecessary rework.
7. Brickwork Curing and Protection
Fresh masonry should be protected from:
- Premature drying
- Heavy rain
- Physical impact
- Excessive vibration
- Contamination
- Uncontrolled loading
Curing requirements should follow the applicable project specification and relevant standards rather than relying on a single generic duration for every masonry situation.
The specification should clearly state:
- When curing begins
- How curing is performed
- Required duration
- Who is responsible for maintaining moisture
- Protection requirements
8. Brickwork Quality-Control Checklist
| Inspection Item | What to Check |
|---|---|
| Bricks | Type, class, dimensions and condition |
| Material approval | Approved source and required documentation |
| Mortar | Correct material and specified mix/performance |
| Setting out | Grid, wall location and opening dimensions |
| Alignment | Line, level and plumb |
| Bond | Correct bonding pattern |
| Joints | Properly filled and correctly finished |
| Junctions | Connection with RCC and adjacent masonry |
| Services | Coordination before closing wall |
| Curing | Required procedure and duration |
| Protection | Protection from damage and weather |
| Measurement | Measurement according to contract/measurement standard |
9. Specifications for Concrete
Concrete specifications require more technical coordination because concrete performance depends on several interacting variables.
These include:
- Cementitious materials
- Aggregates
- Water
- Admixtures
- Mix proportioning
- Workability
- Strength
- Durability
- Exposure
- Transport
- Placing
- Compaction
- Curing
- Testing
For Indian projects, IS 456:2000 remains listed by BIS as the code of practice for plain and reinforced concrete and was reviewed in 2025. IS 383:2016 covers coarse and fine aggregates for concrete, while IS 10262:2019 provides guidelines for concrete mix proportioning.
10. Concrete Materials
10.1 Cementitious Materials
The specification should identify the required cement type and applicable Indian Standard.
For example, BIS lists IS 269:2015 for Ordinary Portland Cement.
However, a project specification should not automatically prescribe OPC for every application. Cementitious materials should be selected according to:
- Structural requirements
- Exposure
- Durability
- Availability
- Heat development
- Construction method
- Project specifications
10.2 Fine and Coarse Aggregate
Aggregates occupy a substantial proportion of concrete volume and significantly influence workability, strength and durability.
IS 383:2016 specifies requirements for coarse and fine aggregates for concrete.
The specification should address:
- Aggregate source
- Type
- Grading
- Nominal size where relevant
- Cleanliness
- Deleterious materials
- Moisture condition
- Testing
- Storage
10.3 Water
Water quality can affect cement hydration and concrete performance.
The specification should establish the requirements for water used for:
- Mixing
- Washing equipment
- Curing
Where non-potable water is proposed, its suitability should be established according to the applicable standard and project requirements.
10.4 Admixtures
Admixtures may be used to modify properties such as:
- Workability
- Setting
- Water demand
- Early-age performance
- Durability-related performance
IS 9103:1999 is listed by BIS for concrete admixtures.
Admixtures should be selected based on the required performance and compatibility with the cementitious system and other concrete constituents.
11. Concrete Mix Proportioning
Concrete should not be specified merely as a list of ingredient quantities unless that is appropriate for the particular work.
For structural concrete, the specification should normally identify the required:
- Concrete grade
- Characteristic strength
- Exposure condition
- Durability requirements
- Maximum water-cementitious ratio where applicable
- Minimum cementitious content where applicable
- Aggregate requirements
- Workability
- Admixture requirements
- Quality-control requirements
IS 10262:2019 provides guidelines for concrete mix proportioning.
Nominal mix vs design mix
A common mistake is to assume that traditional ratios such as 1:2:4 can automatically be used for every concrete element.
Concrete proportioning should follow the applicable code and project design requirements. Where design mix concrete is required, the approved mix design should establish the proportions necessary to achieve the specified performance.
12. Concrete Batching and Mixing
Concrete may be produced:
- At site
- At a batching plant
- As ready-mixed concrete
The specification should define the accepted method.
For RMC, BIS identifies IS 4926:2003 as the code of practice covering production and supply of ready-mixed concrete.
Important controls include
- Correct batching
- Calibration of weighing equipment
- Control of water addition
- Aggregate moisture correction
- Admixture dosage
- Mixing
- Delivery documentation
- Workability checks
- Delivery time
- Traceability of batches
The specification should avoid allowing uncontrolled addition of water at site.
13. Transportation of Concrete
Concrete should be transported in a manner that maintains the required uniformity and workability without harmful segregation.
Possible transportation systems include:
- Transit mixers
- Concrete pumps
- Buckets
- Chutes
- Hoists
The selected method should be appropriate for:
- Pour location
- Height
- Distance
- Concrete workability
- Site access
- Structural element
- Weather conditions
14. Placing Concrete
Concrete should be placed as close as reasonably possible to its final position.
The specification should cover:
- Preparation before pouring
- Formwork inspection
- Reinforcement inspection
- Embedded items
- MEP sleeves and openings
- Concrete delivery
- Placement sequence
- Compaction
- Construction joints
- Surface finishing
- Curing
- Protection
Pre-pour inspection
Before a structural concrete pour, the site team should verify:
- Formwork dimensions
- Level and alignment
- Reinforcement size and spacing
- Cover
- Reinforcement supports
- Construction joints
- Embedded plates
- Sleeves
- MEP openings
- Formwork cleanliness
- Access
- Concrete availability
- Vibrator availability
- Weather conditions
- Inspection approval
This is an important area where architecture, structure and MEP coordination directly affect construction quality.
15. Concrete Compaction
Fresh concrete contains entrapped air.
Compaction reduces unwanted voids and helps concrete surround reinforcement and fill formwork.
Mechanical vibration is commonly used for reinforced concrete.
However, over-vibration should also be avoided, because unsuitable vibration can contribute to segregation or other defects depending on the mix and situation.
The specification should therefore state the approved compaction method and require trained personnel to execute the work.
16. Construction Joints
Construction joints should not be left to arbitrary site decisions.
The specification and structural drawings should establish:
- Permitted locations
- Joint preparation
- Surface treatment
- Continuity requirements
- Reinforcement continuity
- Bonding requirements
- Waterstopping where required
For water-retaining or basement structures, joint detailing may require additional waterproofing and structural provisions.
17. Concrete Curing
Curing is essential because concrete requires suitable moisture and temperature conditions for hydration and strength development.
Common curing methods include:
- Ponding
- Wet coverings
- Continuous water curing
- Membrane curing
- Other approved curing systems
The required curing procedure and duration should follow the applicable project specification and code requirements.
Curing requirements can vary depending on:
- Cement type
- Concrete composition
- Weather
- Exposure
- Element
- Construction sequence
Therefore, a single generic curing duration should not be copied into every project specification.
18. Concrete Testing
Testing provides evidence that the concrete and its constituents meet specified requirements.
18.1 Fresh Concrete Tests
IS 1199 is a series covering sampling, testing and analysis of fresh concrete. BIS identifies parts covering sampling, consistency, density, air content, specimen preparation and other fresh-concrete tests.
The slump test is commonly used to assess the consistency/workability of fresh concrete.
However:
Slump is not a direct measurement of concrete strength.
A concrete mix may have the required slump while still failing to meet other performance requirements.
18.2 Hardened Concrete Tests
IS 516 includes methods for testing hardened concrete.
IS 516 Part 1 Section 1 covers compressive, flexural and split tensile strength testing.
Other parts address properties such as:
- Density
- Water penetration
- Carbonation
- Non-destructive testing
- Rebound hammer testing
- Ultrasonic pulse velocity
- Core testing
- Other performance characteristics
The appropriate test depends on the purpose of the investigation or quality-control requirement.
19. Concrete Quality-Control Checklist
| Stage | Major Checks |
|---|---|
| Material approval | Cement, aggregates, water, admixtures |
| Mix design | Approved mix and required performance |
| Batching | Accurate weighing/dosing |
| Formwork | Line, level, dimensions, stability |
| Reinforcement | Size, spacing, laps, cover and supports |
| MEP coordination | Sleeves, openings and embedded items |
| Fresh concrete | Workability and sampling |
| Placement | Sequence and segregation control |
| Compaction | Appropriate vibration |
| Joints | Approved location and preparation |
| Finishing | Required surface finish and levels |
| Curing | Approved method and duration |
| Strength testing | Required specimen preparation/testing |
| Records | Pour card, delivery tickets and test reports |
20. Brickwork vs Concrete Specification
| Aspect | Brickwork | Concrete |
|---|---|---|
| Primary material | Masonry units and mortar | Cementitious binder, aggregates, water and admixtures |
| Main concern | Bond, alignment and workmanship | Mix performance, placement and structural quality |
| Typical standard references | IS 1077, IS 2212, IS 2250 | IS 456, IS 383, IS 10262 |
| Important site checks | Brick quality, mortar, bond, line and plumb | Mix, workability, reinforcement, placement and compaction |
| Major testing | Brick physical/performance tests | Fresh and hardened concrete tests |
| Curing | Masonry curing | Concrete curing |
| Drawing coordination | Wall thickness/openings/junctions | Structural elements, reinforcement, openings and embedded items |
| Measurement | Usually masonry quantity according to contract rules | Quantity based on applicable measurement provisions |
| Typical defects | Cracking, poor bonding, misalignment | Honeycombing, segregation, cracking, inadequate strength |
21. Measurement and Specification
Measurement is an important part of a construction specification because it affects quantities, BOQ preparation, tendering and payment.
The specification should clearly establish:
- Unit of measurement
- Included work
- Exclusions
- Treatment of openings
- Different classes or types of work
- Special conditions
- Wastage provisions where contractually relevant
- Scaffolding or access provisions where applicable
BIS has historically published IS 1200 as the series for measurement of building and civil engineering works. Importantly, BIS’s current listings show that new 2026 revisions exist for some parts, including Part 3 for brickwork, so measurement clauses should be checked against the edition applicable to the project rather than relying indefinitely on older notes.
22. Example Structure of a Professional Brickwork Specification
A specification can be organized as follows:
Item: Brick Masonry
1. Scope
Providing and constructing brick masonry of the specified type, thickness and location shown on approved drawings.
2. Materials
Bricks shall comply with the applicable product standard and approved project requirements.
3. Mortar
Mortar shall comply with the specified mortar requirements and applicable masonry standards.
4. Workmanship
Masonry shall be constructed to the required line, level, plumb, bond and joint profile.
5. Junctions and openings
Masonry shall coordinate with structural elements, frames, openings and building services.
6. Curing
Masonry shall be cured and protected in accordance with the approved specification.
7. Inspection
Work shall be inspected for material quality, alignment, joints, openings and workmanship.
8. Measurement
Measurement shall follow the applicable contract and measurement standard.
This format is more useful than simply writing “first-class brickwork in 1:5 mortar.”
23. Example Structure of a Professional Concrete Specification
Item: Reinforced Concrete
1. Scope
Providing, placing, compacting, finishing and curing concrete of the specified grade and performance.
2. Materials
Cementitious materials, aggregates, water and admixtures shall comply with applicable standards.
3. Mix design
Concrete shall be produced using an approved mix satisfying the specified strength, durability and workability requirements.
4. Reinforcement
Reinforcement shall be as detailed in the structural drawings and schedules.
5. Formwork
Formwork shall be stable, accurately positioned and capable of maintaining the specified dimensions.
6. Pre-pour inspection
Concrete shall not be placed until formwork, reinforcement, embedded items, openings and other required inspections are completed.
7. Placing and compaction
Concrete shall be placed and compacted using approved procedures.
8. Testing
Fresh and hardened concrete shall be sampled and tested as required by the project specification.
9. Curing
Concrete shall be cured using an approved method for the required period.
10. Records
Concrete delivery records, test results, inspection records and pour documentation shall be maintained.
24. Common Mistakes in Brickwork Specifications
1. Using outdated standards
Old educational notes often contain previous editions of standards.
2. Treating one mortar ratio as universal
Mortar selection should be project-specific.
3. Giving no testing requirements
A specification should explain how material compliance will be demonstrated.
4. Ignoring junctions
Brickwork interfaces with RCC and services require coordination.
5. No tolerance requirements
Line, level, plumb and dimensional tolerances should be addressed where necessary.
6. Copying specifications from another project
Specifications should be developed for the actual building and contract.
25. Common Mistakes in Concrete Specifications
1. Specifying concrete only by grade
Strength alone does not describe the complete performance requirement.
2. Ignoring durability
Exposure and durability requirements should be considered in addition to strength.
3. Allowing uncontrolled water addition
Water addition can alter the intended concrete characteristics.
4. Omitting MEP coordination
Sleeves and embedded items should be coordinated before concrete placement.
5. No pre-pour inspection procedure
Concrete should not be treated as simply a delivery-and-pour operation.
6. Treating slump as a strength test
Slump primarily relates to consistency/workability; it does not establish compressive strength.
7. No testing records
Test results should be traceable to the relevant concrete pour or batch.
8. Inadequate curing provisions
Curing should be treated as part of the concrete construction process, not an optional finishing activity.
26. Practical Specification Workflow for Architects
A useful workflow is:
Step 1 — Study drawings
Identify walls, slabs, beams, columns, foundations and special construction conditions.
Step 2 — Identify materials
Determine the required brick, mortar, concrete and related materials.
Step 3 — Check applicable standards
Verify current standards applicable to the material and construction process.
Step 4 — Define performance
Specify strength, durability, dimensions, appearance or other required characteristics.
Step 5 — Define workmanship
Explain how the work should be executed.
Step 6 — Define inspection and testing
State what should be inspected and tested.
Step 7 — Coordinate disciplines
Check architecture, structure, MEP and landscape interfaces.
Step 8 — Coordinate BOQ
Ensure the specification corresponds with the BOQ descriptions and units.
Step 9 — Review contract requirements
Resolve conflicts before issuing tender or construction documents.
Step 10 — Control revisions
Ensure drawings, specifications and BOQ are updated consistently when changes occur.
27. Why Good Specifications Matter in Architecture
Specifications are not merely technical text attached to drawings.
They influence:
- Material quality
- Construction workmanship
- Cost estimation
- Procurement
- Tendering
- Quality control
- Site inspection
- Contractor understanding
- Consultant coordination
- Payment measurement
- Dispute prevention
- Long-term building performance
For architects, the most useful specification is not necessarily the longest one. It is the one that clearly defines what is required and provides a practical basis for verification.
28. Sustainability Considerations
Specifications can also support sustainable construction.
For brickwork, consider:
- Responsible material sourcing
- Local availability
- Appropriate masonry design
- Durability
- Reuse where appropriate
- Reduction of unnecessary wastage
For concrete, consider:
- Optimized mix design
- Appropriate cementitious materials
- Aggregate efficiency
- Durability
- Reduced wastage
- Recycled materials where permitted
- Ready-mixed concrete logistics
- Appropriate service life
Sustainability requirements should be coordinated with structural design and project performance requirements rather than treated as an isolated material-selection exercise.
29. Frequently Asked Questions
What is a specification in building construction?
A specification is a written document describing the required materials, quality, workmanship, execution methods, testing, inspection and measurement for construction work.
What should a brickwork specification include?
It should normally include the masonry unit, applicable standards, mortar, bond, wall thickness, workmanship, joints, openings, junctions, curing, inspection and measurement requirements.
What should a concrete specification include?
A concrete specification should address materials, concrete grade and performance, mix proportioning, durability, workability, batching, placing, compaction, curing, testing and quality-control requirements.
Which Indian Standard is used for brickwork?
IS 2212:1991 is listed by BIS as the code of practice for brickwork. Material requirements for common burnt clay building bricks are addressed by IS 1077; BIS currently lists the 2025 edition.
Which standard covers masonry mortar?
IS 2250:1981 is listed by BIS as the code of practice for preparation and use of masonry mortars.
Which standard covers concrete design and construction?
IS 456:2000 is listed by BIS as the code of practice for plain and reinforced concrete.
Which standard covers concrete mix proportioning?
IS 10262:2019 provides guidelines for concrete mix proportioning.
Is slump a concrete strength test?
No. The slump test is primarily used to assess the consistency or workability of fresh concrete. Concrete strength requires appropriate hardened-concrete testing.
Why are specifications important for architects?
Specifications convert design intent into practical requirements for materials, workmanship, testing and quality control. They also help coordinate drawings, BOQs, procurement and site execution.
Should old brickwork specifications be copied into new projects?
No. Existing specifications can be used as references, but the applicable standards, project requirements, materials, structural design, environmental conditions and contract requirements should be checked before issuing a new specification.
Conclusion
Specifications for brickwork and concrete provide the written connection between architectural design, structural requirements and construction execution.
A useful specification should do more than identify a material or traditional mix ratio. It should establish the required quality, standards, workmanship, execution, inspection, testing, curing, protection and measurement.
For brickwork, attention should be given to masonry units, mortar, bonding, alignment, joints, openings, interfaces and curing.
For concrete, the specification must go further by addressing mix proportioning, materials, durability, batching, workability, reinforcement, formwork, placement, compaction, construction joints, curing and testing.
The most important principle is to treat specifications as project-specific technical documents. Current standards should be verified, drawings and BOQs should be coordinated, and generic construction notes should not automatically be treated as mandatory requirements.
For architecture students, learning to write specifications develops an understanding of how drawings become buildings. For practicing architects, well-coordinated specifications provide a clearer framework for procurement, construction quality and communication between the design team and site team.
References for Further Study
Key standards relevant to this topic include:
- BIS — IS 1077:2025, Common Burnt Clay Building Bricks
- BIS — IS 2212:1991, Brick Works — Code of Practice
- BIS — IS 2250:1981, Preparation and Use of Masonry Mortars
- BIS — IS 456:2000, Plain and Reinforced Concrete
- BIS — IS 383:2016, Coarse and Fine Aggregate for Concrete
- BIS — IS 10262:2019, Concrete Mix Proportioning
- BIS — IS 9103:1999, Concrete Admixtures
- BIS — IS 1199 series, Fresh Concrete — Methods of Sampling, Testing and Analysis
- BIS — IS 516 series, Hardened Concrete — Methods of Test
- BIS — IS 4926:2003, Ready-Mixed Concrete
- BIS — IS 1200 series, Methods of Measurement of Building and Civil Engineering Works
Always verify the edition and applicability of a standard before incorporating it into a live contract document.