CONSTRUCTION MANAGEMENT PRACTICES CRITERION SIX

If you want to know about the energy conservation building Code or about the GRIHA and function or about the green building, please click the link.


Construction management practices refer to the processes and procedures that are used to plan, execute, and control construction projects from start to finish.

  • The intent of this criterion is to ensure adoption of good management practices on site during the construction phase.

Maximum Points : 2

1) Appraisal

Appraisal – 1 ( Optional for 1 points )

  • Adopt construction management practices and ensure safe disposal of waste generated during construction.

Appraisal – 2 ( Optional for 1 points )

  • Adopt at least two strategies from the list, as given below, to minimize water consumption during construction.
  • Mandatory Adopt at least two strategies from the list, as given below, to minimize water consumption during construction.
  1. Meter and monitor the consumption of water during construction.
  2. Use water-reducing admixture in concrete mix.
  3. Use of treated wastewater and/or captured storm water.

2) Compliance

Compliance – 1

  • Submit site management plan (.dwg format) highlighting the location of storage areas for various construction materials such as steel, building blocks, or stone, and for waste generated such as empty cement bags, packaging waste, or construction / demolition debris to demonstrate compliance with Appraisal – 1 ( Optional for 1 points ).

Compliance – 2

  • Submit copies of log sheets for the total quantity of waste generated, reused and/or sold to recyclers on site, demonstrating compliance with Appraisal – 1 ( Optional for 1 points ). (Refer Appendix 2C).

Compliance – 3

  • Submit copies of challans for all the waste material sold to recyclers demonstrating compliance with Appraisal – 1 ( Optional for 1 points ).

Compliance – 4

  • Install water meter on all sources of water such as tube well, municipal supply, and others to monitor the consumption of water and submit date-stamped photographs demonstrating compliance with Appraisal – 1 ( Optional for 1 points ) and Appraisal – 2 ( Optional for 1 points ).

Compliance – 5

  • Submit narrative describing various strategies adopted to reduce water consumption to demonstrate compliance with Appraisal – 2 ( Optional for 1 points ).

Compliance – 6

  • Submit copies of challans indicating that the treated water from STP has been used on site demonstrating compliance with Appraisal – 2 ( Optional for 1 points ).

Compliance – 7

  • Submit copies of logbooks for the total quantity of water consumed, demonstrating compliance with Appraisal – 2 ( Optional for 1 points ). (Refer to Appendix 2D).

Compliance – 8

  • Submit a design mix report and a batch mix report indicating the use of admixture to demonstrate compliance with Appraisal – 2 ( Optional for 1 points ).

Compliance – 9

  • Submit purchase order reflecting full quantities of admixtures used during the construction phase to demonstrate compliance with Appraisal – 2 ( Optional for 1 points ).

Compliance – 10

  • Submit technical specification sheet/brochure of admixture used during the construction phase.

OR

  • Submit a valid GRIHA Product Catalogue certificate as applicable for the product to demonstrate compliance with Appraisal – 2 ( Optional for 1 points ).

Compliance – 11

  • Upload date-stamped photographs with description of construction management practices adopted on site.

These are some of the key criteria that can be used to evaluate the effectiveness of construction management practices in ensuring the success of a construction project.